Appendix e - table of pre-qualified led fixtures-luminaire…

Appendix E
TABLE OF PRE-QUALIFIED LED FIXTURES /
LUMINAIRES & QUALIFICATION PROCESS

Appendix E: Table of Pre-Qualified LED Fixtures /
Luminaires & Qualification Process
(effective June 1, 2009)

The Table of Pre-Qualified LED Fixtures/Luminaires was generated under the following guidelines: 1. All fixtures must be ENERGY STAR®-qualified or DesignLights Consortium (DLC) 2. If a fixture is not ENERGY STAR®-qualified, it must be vetted through DLC for pre- qualification. See Section E2 of this appendix for qualification process instructions and required manufacturer-provided supporting documentation. Please note, DLC qualification for fixtures must be completed prior to application submittal. E1: TABLE OF PRE-QUALIFIED LED FIXURES/LUMINAIRES
E2: LED FIXTURES/LUMINAIRES QUALIFICATION PROCESS
E3: APPENDIX OF RESOURCES
E1: TABLE OF PRE-QUALIFIED LED FIXTURES/LUMINAIRES
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
ENERGY STAR
REVIEWED
MANUFACTURER
QUALIFIED
QUALIFIED
QUALIFIED
E2: LED FIXTURES/LUMINAIRES QUALIFICATION PROCESS
Please note, DesignLights Consortium (DLC) qualification for fixtures must be completed prior to application submittal. For Fixtures/Luminaires not currently covered by an ENERGY STAR label, please utilize the DLC process found at: http://designlights.org/solidstate.about.php Once DLC has qualified the LED fixture/luminaire, Section E1 will be updated.
E3: APPENDIX OF RESOURCES
Testing Services
(From CALiPER and DOE Manufacturer's Guide - http://www1.eere.energy.gov/buildings/ssl/test_labs.html) LM-79 and LM-80 Testing Laboratories
Integrating Sphere (LM-79 Section 9.1 and 9.2)
• Independent Testing Laboratories, Inc. – Boulder, CO http://www.itlboulder.com/ • Intertek – Cortland, NY http://www.intertek-etlsemko.com/ • Luminaire Testing Laboratory, Inc. – Allentown, PA http://www.luminairetesting.com/ • Lighting Sciences, Inc. – Scottsdale, AZ http://www.lightingsciences.com/home/ • OnSpeX/CSA International – Atlanta, GA http://www.onspex.com/ • Aurora International Testing Laboratory – Aurora, OH Brochure Guide • Orb Optronix Inc. – Kirkland, WA http://www.orboptronix.com/ Goniophotometry (LM-79 Section 9.3)
• Independent Testing Laboratories, Inc. – Boulder, CO http://www.itlboulder.com/ • Intertek – Cortland, NY http://www.intertek-etlsemko.com/ • Luminaire Testing Laboratory, Inc. – Allentown, PA http://www.luminairetesting.com/ • Lighting Sciences, Inc. – Scottsdale, AZ http://www.lightingsciences.com/home/ • OnSpeX/CSA International – Atlanta, GA http://www.onspex.com/ UL 1598 or UL 153 testing Nationally Recognized Testing Laboratories (NRTLs)
• Canadian Standards Association (CSA); • Intertek Testing Services NA, Inc. (ITSNA); • SGS U.S. Testing Company, Inc. (SGSUS); • TUV Rheinland of North America, Inc. (TUV); • Underwriters Laboratories Inc.(UL); and • A complete and current listing of NRTLs: http://www.osha.gov/dts/otpca/nrtl/

Source: https://www.sce.com/NR/rdonlyres/F0F33D44-0E55-49BE-ABF5-48493ECBBD12/0/100624_App_E_PreQualified_LED_FixturesLuminairesV1_7.pdf

Microsoft word - 3cf68827-0a9b-7846.doc

The New Holy War By John Lyman This article appeared in the April 18th, 2002 issue of Tacoma Reporter Newspaper Cover photo: Matthew Hale, leader of the World Church Of The Creator The New Holy War By John Lyman This article was previously published and appeared in the Tacoma Reporter newspaper. Contents of this article are copyrighted and the property of John Lyman. This

Emergenza music festival - germany

http://www.emergenzafestival.de/showreviews.php?ID=157Letzte Vorrunde in Marburg, Köln und in Frankfurt!Die Bands zeigten vielfältige Stilrichtungen in allen 3StädtenWritten 21.3.2011 by Sabrina Lüftner Die Tour startet dieses Wochenende im KFZ Marburg. In diesem Jahr war ich dort schon einmal mitEmergenza. Bunt gemischtes Genre und 9 Bands, davon nur wenigeaus Marburg dir

Copyright ©2018 Sedative Dosing Pdf